| 1. |
Casing pipe is correctly positioned. |
 |
| 2. |
Casing pipe is driven into the ground using a vibro-hammer. |
 |
| 3. |
When it reaches the required depth, the casing pipe is charged with a specified volume of sand. |
 |
| 4. |
As the casing pipe is raised by a specified margin, the sand is discharged into the ground using compressed air. |
 |
| 5. |
The sand pile is compacted and enlarged by driving the pipe back down into the sand. |
 |
| 6. |
The pipe-raising, sand discharge and re-driving procedure is repeated numerous times as the pipe is gradually removed, forming a complete compacted sand pile. |
 |